Denniston Water Treatment Plant Tanks Recoating Project
Engineers Estimate: $115,000.00 || Items of work include but are not limited to: • Provide submittals for owner review for all materials. • Surface preparation and installation of interior coating in the interior of new manway hatches being welded in under separate contract on two contact clarifier tanks. • Surface preparation and installation of exterior coating on two contact clarifier tanks. • Surface preparation and installation of exterior coating on three filter tanks. • Surface preparation and installation of exterior coating on one coagulation tank. • Provide containment and disposal for lead based paint as required by laws and regulations based on lead testing results provided by owner. • Coordination of schedule with separate welding project for contact clarifier work.
Plans
(click to expand/collapse)
Name | Size | ||
Denniston Coating-Bid Plans 2024-08-08 | 3.9 MB |