Denniston Water Treatment Plant Tanks Recoating Project

Engineers Estimate: $115,000.00 || Items of work include but are not limited to: • Provide submittals for owner review for all materials. • Surface preparation and installation of interior coating in the interior of new manway hatches being welded in under separate contract on two contact clarifier tanks. • Surface preparation and installation of exterior coating on two contact clarifier tanks. • Surface preparation and installation of exterior coating on three filter tanks. • Surface preparation and installation of exterior coating on one coagulation tank. • Provide containment and disposal for lead based paint as required by laws and regulations based on lead testing results provided by owner. • Coordination of schedule with separate welding project for contact clarifier work.
Addendum No. 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum 1-Denniston Tanks Coating 2024-08-22 598.5 KB