Public Projects

Bids Due in 15 days
5/8/25 2:00pm
EV FLEET CHARGER EXPANSION & TRENCHING PROJECT #0384
Bids Due in 15 days
Silicon Valley Clean Water
Engineers Estimate: $500,000 | The general scope of work includes but is not necessarily limited to the construction of new EV charger station infrastructure installation which includes obtaining an encroachment permit; electrical provisions for the connection of new EV charging station equipment including providing new switchboard, panelboard and transformer equipment, construction of a new gravel-filled median island for electrical equipment, electrical equipment pads, and EV charger pads; installation of wheel stops; installation of permanent, removable, and surface mount bollards; removal and replacement of existing fencing; landscape restoration; concrete curbs; paving; and striping of the parking lot.
Bids Due in 8 days
5/1/25 2:00pm
Traffic Signal Modification at Poplar Avenue and Humboldt Street NO. 17017
Bids Due in 8 days
City of San Mateo
Engineers Estimate: $406,200 | The following work descriptions are provided for informational purposes: ~Mobilization/Demobilization ~Temporary Traffic and Pedestrian Control System ~Traffic Signal Modification. Additional details can be found in the specifications.
Bids Due in 13 days
5/6/25 2:00pm
San Bruno City Park Tennis Court Repairs
Bids Due in 13 days
City of San Bruno
This project comprises a comprehensive upgrade to the exiting tennis courts infrastructure. The work includes, but is not limited to repairing exposed asphalt areas, including leveling surfaces, filling and sanding cracks, and applying multiple coats of acrylic resurfacer and color. Additionally, this project includes painting net posts, reusing or replacing nets, and striping four tennis courts and two pickleball courts.
Bidding Closed
4/8/25 2:00pm
Fleet Maintenance Services RFP
Bidding Closed
City of San Mateo
Request for Proposal | Estimated Annual Contract Amount: $950,000 | Start Date: March 18, 2025 - End Date: April 8, 2025
Bidding Closed
4/16/25 2:00pm
Citywide Street Rehabilitation/Seal Project 3-A
Bidding Closed
City of San Mateo
Engineers Estimate: $1,750,000
Bidding Closed
4/9/25 2:00pm
Median Modifications on Foster City Blvd. Project (CIP 301-635)
Bidding Closed
City of Foster City
Foster City Blvd between Chess Drive and Metro Center Blvd
Engineer’s Estimate: $ 122,000 | This project includes striping removal, concrete, curb, and paver removal, concrete curb installation, installation of pavers, installation of traffic striping and markings and grade adjustments.
Bidding Closed
4/18/25 2:00pm
East Hillsdale Park Playground Improvements Project
Bidding Closed
City of San Mateo
123 31st Ave., San Mateo, CA 94403
Engineer’s estimate: $2.0 million || The Project is located at 123 31st Ave., San Mateo, CA 94403, and is described as follows: Protection of existing trees, demolishing existing play equipment and pathways, excavation and grading, installing play equipment, play area safety surfacing, new pathway paving, park lighting upgrades, improvements to the storm water drain system, site furnishings, synthetic turf, irrigation, and landscaping.
Bidding Closed
3/27/25 2:00pm
Citywide Baseball Field Upgrades Phase I - Diamond 3 Field Lights CIP Project No. 51025
Bidding Closed
City of San Bruno
This project comprises a comprehensive upgrade to the exiting sports field lighting infrastructure across multiple city sports fields. The work includes, but is not limited to site preparation, safe removal and disposal of existing fixtures(including PCB management), foundation preparation for new poles, and the installation of code-compliant LED lighting to Illuminating Engineering Society(IES) standards. Thorough testing and commissioning, coupled with stringent safety protocols.
Bidding Closed
3/20/25 2:00pm
2025 Street Resurfacing Project (CIP No. 401)
Bidding Closed
Town of Hillsborough
Various Locations in Hillsborough, CA
Engineers Estimate: $2,300,000 (Base Bid)
Bidding Closed
3/5/25 1:00pm
Commuter Shuttle Stop Improvements
Bidding Closed
City of Brisbane
Engineer's Estimate: $222,000 || As shown in the COMMUTER SHUTTLE STOP IMPROVEMENTS plans and required by these specifications and special provisions, this project includes, but is not limited to, furnishing all labor, materials and equipment necessary for completion of the project.