Denniston Water Treatment Plant Tanks Recoating Project

Engineers Estimate: $115,000.00 || Items of work include but are not limited to: • Provide submittals for owner review for all materials. • Surface preparation and installation of interior coating in the interior of new manway hatches being welded in under separate contract on two contact clarifier tanks. • Surface preparation and installation of exterior coating on two contact clarifier tanks. • Surface preparation and installation of exterior coating on three filter tanks. • Surface preparation and installation of exterior coating on one coagulation tank. • Provide containment and disposal for lead based paint as required by laws and regulations based on lead testing results provided by owner. • Coordination of schedule with separate welding project for contact clarifier work.

Status

Bidding Closed

Bid Date 9/3/24 10:00am

Company & Contacts

Coastside County Water District
Sean Donovan,  
(650)726-4405

Location

Half Moon Bay, CA 94019