2024 REBID - CIP 455-695 Lift Station 59 Effluent Line Improvements Project

Engineer's Estimate: $1.2-$1.4M | The Work shall include the following modifications, replacements and improvements: • Design, furnish, install, disassemble and hand over temporary bypass system; • Furnish and install new isolation knife gate valve on the manifold; • Furnish and install new ball valve; • Construct new flow meter vault with associated fittings and sump pump; • Connect new flowmeter to the control room and sump pump to existing panel inside pump house; • Leak test and hydrostatic pressure test of the new components and sub-systems; • Field calibration of flowmeter; • Final testing and commissioning of the project as a fully functional and operational system; • Cleanup and restoration of the construction work area within the LS59 yard construction zone.
Bid Book (click to expand/collapse)
Name Size
CIP 695_Bid Book 3.6 MB
Specs (click to expand/collapse)