2024 REBID - CIP 455-695 Lift Station 59 Effluent Line Improvements Project

Engineer's Estimate: $1.2-$1.4M | The Work shall include the following modifications, replacements and improvements: • Design, furnish, install, disassemble and hand over temporary bypass system; • Furnish and install new isolation knife gate valve on the manifold; • Furnish and install new ball valve; • Construct new flow meter vault with associated fittings and sump pump; • Connect new flowmeter to the control room and sump pump to existing panel inside pump house; • Leak test and hydrostatic pressure test of the new components and sub-systems; • Field calibration of flowmeter; • Final testing and commissioning of the project as a fully functional and operational system; • Cleanup and restoration of the construction work area within the LS59 yard construction zone.
Addendum No. 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
CIP 695 - Addendum No. 1 14.3 MB
Addendum No. 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum No. 2_8.20.2024 105.2 KB
Addendum No. 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
CIP 695 - Addendum 3 082724 16.1 MB
Notice of Intent to Award (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
CIP 695 - NOI 9.13.2024 103.7 KB
Q&A (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Questions 9.3.2024_Posted 71.2 KB