2024 REBID - CIP 455-695 Lift Station 59 Effluent Line Improvements Project
Engineer's Estimate: $1.2-$1.4M | The Work shall include the following modifications, replacements and improvements: • Design, furnish, install, disassemble and hand over temporary bypass system; • Furnish and install new isolation knife gate valve on the manifold; • Furnish and install new ball valve; • Construct new flow meter vault with associated fittings and sump pump; • Connect new flowmeter to the control room and sump pump to existing panel inside pump house; • Leak test and hydrostatic pressure test of the new components and sub-systems; • Field calibration of flowmeter; • Final testing and commissioning of the project as a fully functional and operational system; • Cleanup and restoration of the construction work area within the LS59 yard construction zone.
Addendum No. 1
(click to expand/collapse)
Name | Size | ||
CIP 695 - Addendum No. 1 | 14.3 MB |
Addendum No. 2
(click to expand/collapse)
Name | Size | ||
Addendum No. 2_8.20.2024 | 105.2 KB |
Addendum No. 3
(click to expand/collapse)
Name | Size | ||
CIP 695 - Addendum 3 082724 | 16.1 MB |
Notice of Intent to Award
(click to expand/collapse)
Name | Size | ||
CIP 695 - NOI 9.13.2024 | 103.7 KB |
Q&A
(click to expand/collapse)
Name | Size | ||
Questions 9.3.2024_Posted | 71.2 KB |