Central Park Playground Improvements Project #610027

Engineer’s Estimate $8,774,000.00: Demolition of existing play equipment, pathways, restroom building, and trees; Water pollution control and site protection measures; Tree removal and protection measures; Construct new custom play equipment and safety surfacing, new pre­ engineered restroom, new picnic structure and concrete pad, new pedestrian pavements, raised boardwalk, water feature, fencing, site furnishings, irrigation, planting, site utilities (water,sewer,stormwater drainage), signage,lighting and other specified improvements ; Construct new utility service connections in ROW of El Camino Real, State Route 82, under Encroachment Permit and jurisdiction of California Department of Transportation; Traffic and pedestrian control throughout construction.

Status

Bidding Closed

Prebid Date7/17/24 8:00am

Bid Date9/6/24 2:00pm

Company & Contacts

City of San Mateo Parks & Recreation Dep
King Leong  

Location

50 East 5th Avenue, San Mateo, CA

Please download the remainder of Addendum 3 here, as the files are kept in order by folder.

ADDENDUM No. 3 - As-Builts (Zip Folder)

http://uploadsd.barkerblue.com/ClientView/?req=epp&id=9XRYMO9F&xf=20240820-004