Central Park Playground Improvements Project #610027

Engineer’s Estimate $8,774,000.00: Demolition of existing play equipment, pathways, restroom building, and trees; Water pollution control and site protection measures; Tree removal and protection measures; Construct new custom play equipment and safety surfacing, new pre­ engineered restroom, new picnic structure and concrete pad, new pedestrian pavements, raised boardwalk, water feature, fencing, site furnishings, irrigation, planting, site utilities (water,sewer,stormwater drainage), signage,lighting and other specified improvements ; Construct new utility service connections in ROW of El Camino Real, State Route 82, under Encroachment Permit and jurisdiction of California Department of Transportation; Traffic and pedestrian control throughout construction.
Addendum No. 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
01 Addendum Central Park Playground Improvements Project 7.9.24 239.4 KB
Addendum No. 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
02 Addendum Central Park Playground Improvements Project 7.23.24 507.6 KB
Addendum No. 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum No. 3 Animal Tracks.dwg 453.9 KB
Addendum No. 3 Central Park Playground Improvements Project Issued 8.19.24 312.3 KB
Plans_Central Park Playground_BID_20240819 156.6 MB
Specifications_Central Park Playground_Bid_20240819 7.6 MB
Addendum No. 4 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
04 Addendum Central Park Playground Improvements Project 8.22.24 266.0 KB
Addendum #4 Bid Proposal 166.1 KB