Wastewater Treatment Plant Roof Replacement Phase II
The work includes the removal and replacement of existing modified bituminous roofing and exterior concrete wall repairs on the Operations Building, and seismic strengthening to the roof structure at the Operations Building.
Specs
(click to expand/collapse)

Name | Size | ||
167060 - Construction Documents Specifications_30 May 2023 - 2 | 1.3 MB |