Wastewater Treatment Plant Roof Replacement Phase II

The work includes the removal and replacement of existing modified bituminous roofing and exterior concrete wall repairs on the Operations Building, and seismic strengthening to the roof structure at the Operations Building.
Addendum No. 1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum 1 13.6 MB
Addendum No. 2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Wastewater Treatment Plant Roof Replacement - Addendum 2 62.4 KB
Addendum No. 3 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Wastewater Treatment Plant Roof Replacement - Addendum 3 62.6 KB
Addendum No. 4 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Wastewater Treatment Plant Roof Replacement - Addendum 4 1.8 MB
Addendum No. 5 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Wastewater Treatment Plant Roof Replacement - Addendum 5 192.0 KB