Wastewater Treatment Plant Roof Replacement Phase II
The work includes the removal and replacement of existing modified bituminous roofing and exterior concrete wall repairs on the Operations Building, and seismic strengthening to the roof structure at the Operations Building.
Addendum No. 1
(click to expand/collapse)

Name | Size | ||
Addendum 1 | 13.6 MB |
Addendum No. 2
(click to expand/collapse)

Name | Size | ||
Wastewater Treatment Plant Roof Replacement - Addendum 2 | 62.4 KB |
Addendum No. 3
(click to expand/collapse)

Name | Size | ||
Wastewater Treatment Plant Roof Replacement - Addendum 3 | 62.6 KB |
Addendum No. 4
(click to expand/collapse)

Name | Size | ||
Wastewater Treatment Plant Roof Replacement - Addendum 4 | 1.8 MB |
Addendum No. 5
(click to expand/collapse)

Name | Size | ||
Wastewater Treatment Plant Roof Replacement - Addendum 5 | 192.0 KB |