Pedestrian Walkway - Alvarado St. to San Benito Rd
Engineer's Estimate: $294,147 || MANDATORY Pre-Bid Meeting : Tuesday Feb 18, 2025 @ 11 AM || This project includes, but is not limited to, furnishing all labor, materials and equipment necessary for constructing concrete stairway, including a prefabricated steel section, on a hillside located within a twelve-foot wide city right-of-way. Construction includes excavation and earthwork, construction of stairways and metal handrails, installation of bollard lights and miscellaneous drainage improvements.
Addendum No. 1
(click to expand/collapse)

Name | Size | ||
Addendum 1 25_03_03 | 184.6 KB |