Santa Barbara Ave & Vista Grande Ave Green Stormwater Infrastructure & Pedest. Improv. Project
ENGINEER'S ESTIMATE: $365,214.00 | The work includes traffic control, potholing, sawcutting, removal, disposal, and reconstruction of AC roadway sections, removal and reconstruction of concrete sidewalk, curb and gutter, and curb ramps, removal and reconstruction of storm drain catch basin with connections, installation of bio-retention planters within the sidewalk, installation of subdrain system, installation of decorative railing, replacement of sanitary sewer manhole frame and cover, replacement of utility boxes, removal and application of pavement striping and markings, installation of pedestrian safety markers, speed bumps, and painted bulb-outs, and other work as shown on the plans or as specified in the specifications.
Specs
(click to expand/collapse)

Name | Size | ||
00020_NIB_SEP_sc | 184.5 KB | ||
Specs_Santa Barbara & Vista Grande GI and Ped Improvement | 3.3 MB |