Basin C Sanitary Sewer Rehabilitation Project
Engineer's Estimate: $6,200,000.00 || Project Description: Repair and rehabilitation of existing sanitary sewer manholes, including patching and coating interior surfaces of manholes, replacing manholes, replacing cleanouts, raising manholes, reforming inverts, and replacing manhole frames and covers. Cured-in-place pipe lining of existing sanitary sewer pipes. Pipe bursting existing sanitary sewer mains and reconnection of the existing laterals. Replacement of existing sanitary sewer mains and lateral connections. Bypass pumping and/or rerouting of sewage as necessary for construction of the project per plans and specifications. Spot repairs and lateral connection repairs. Dewatering and the construction of all temporary shoring and slope protection systems required to complete the work. Water pollution control and site protection measures shown on the plans, specified herein, and/or required by regulatory agencies. Traffic and pedestrian control throughout construction in conformance with the plans, and as directed by the City. Replacement of damaged or disturbed landscaping, private improvements, fences, curb & gutter, sidewalks, curb ramps, traffic loops, and other miscellaneous items. Site restorations for areas disturbed by construction. Other miscellaneous and incidental improvements for complete facilities.
Plans
(click to expand/collapse)
Name | Size | ||
BasinC-SanitarySewerRehabilitationProject-Plans | 89.3 MB |