Engineer's Estimate: $1,210,000 | This Project includes furnishing all labor and materials, equipment, tools and services necessary to replace, rehabilitate, or newly install approximately 3,500 LF of existing 6- inch or 8-inch sanitary sewer pipe at various locations throughout the Town using open cut, horizontal Directional Drilling, and pipe bursting methods in the public right-of-way and along easement areas. Work shall be completed within 180 Calendar Days from the date when Contract Time commences to run.