Acappella Well Project (Commodore Park Well Replacement) – Phase I Production Well Project No. 84709
Engineer’s Estimate: $944,805 | The work includes, but is not limited to: destroying existing water supply well, grouting in-place a steel conductor casing, maintaining a drilling fluid program, drilling a production borehole beneath the conductor casing, performing surveys in the completed borehole, installing casing assembly, equipping the casing with centralizers, installing a still well in the casing, installing a gravel fill pipe, installing a graded gravel envelope, and placing sand/cement annular seal.