La Honda Sanitary Sewer Lift Station Upgrade
Engineers Estimate: $1,160,000.00 || The Work includes, without limitation, removing and replacing equipment, wetwells, manholes, sewer pipe, forcemains, installing a new wetwell and valve vault and new equipment at sewage lift station. Equipment to be replaced and installed include pumps, piping, valves, electrical and telemetry equipment, sewer mains, manholes, forecemains, and other items shown to be constructed on the contract drawings or specifications, including repair, and reconstruction of existing improvements affected by the Work, and incidentals for complete and usable facility. Work includes Contractors responsibility to field verify and field route proposed pipelines to minimize conflicts.