23-24 and 24-25 Street Rehabilitation Project No. 60039 & 60048

Engineer's Estimate: $6,200,000.00 || The work includes, but is not limited to: mobilization, traffic control, water pollution control, dust prevention and control, site cleanup, asphalt concrete grinding/removal, asphalt concrete installation, asphalt concrete base repair, ADA ramp construction, utility cover lowering & restoring to grade, loop detector replacement, striping removal & replacement at various locations Citywide.
Specs (click to expand/collapse)