Winter Storm Hazard Mitigation Project

Engineer's Estimate: $219,400 | The work includes but is not limited to: installing a soldier pile wall in cast-in-drilled-holes (CIDH) using W12x35 steel beams at a depth of 25 feet. The wall features 4 inch by 12 inch pressure treated wood lagging, spanning 42 feet long and 7 feet high. The project also consists of a subdrain system behind the proposed retaining wall.

Status

Bidding Closed

Prebid Date7/3/24 10:00am

Bid Date7/12/24 2:00pm

Company & Contacts

City of San Bruno
Calvin Iwan  
650-616- 7065