Winter Storm Hazard Mitigation Project
Engineer's Estimate: $219,400 | The work includes but is not limited to: installing a soldier pile wall in cast-in-drilled-holes (CIDH) using W12x35 steel beams at a depth of 25 feet. The wall features 4 inch by 12 inch pressure treated wood lagging, spanning 42 feet long and 7 feet high. The project also consists of a subdrain system behind the proposed retaining wall.
Addendum #1
(click to expand/collapse)
Name | Size | ||
2024-07-01 San Bruno - 425 Cunningham - Bid Addendum 1 | 1.0 MB |
Addendum #2
(click to expand/collapse)
Name | Size | ||
2024-07-08 San Bruno - 425 Cunningham - Bid Addendum 2 | 3.4 MB |
Notice of Intent to Award
(click to expand/collapse)
Name | Size | ||
Notice_of_Intent_to_Award | 359.8 KB |