Winter Storm Hazard Mitigation Project

Engineer's Estimate: $219,400 | The work includes but is not limited to: installing a soldier pile wall in cast-in-drilled-holes (CIDH) using W12x35 steel beams at a depth of 25 feet. The wall features 4 inch by 12 inch pressure treated wood lagging, spanning 42 feet long and 7 feet high. The project also consists of a subdrain system behind the proposed retaining wall.
Addendum #1 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2024-07-01 San Bruno - 425 Cunningham - Bid Addendum 1 1.0 MB
Addendum #2 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2024-07-08 San Bruno - 425 Cunningham - Bid Addendum 2 3.4 MB
Notice of Intent to Award (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Notice_of_Intent_to_Award 359.8 KB