21-22 Street Reconstruction Rebid Project 60018
Engineer's Estimate: $2.71 mil | The work includes but is not limited to: Hot mix asphalt base repair, removing and replacing concrete sidewalk, curb and gutter, installing ADA-compliant curb ramps, and replacing striping.
Specs
(click to expand/collapse)
Name | Size | ||
2024-05-15 San Bruno Pavement - Rebid Specifications Set | 4.4 MB |