Crestwood Pump Station and Crestwood Drive Sewer Main Replacement Project Project Nos. 31004, 31006
Engineer's Estimate: $6,000,000 | The work includes, but is not limited to: Rehabilitation and upgrade to the Crestwood Pump Station including replacement of key components, installation of a new replacement discharge force main along a different alignment than the existing one, new gravity sewer pipe and manholes, new pump station, water service replacement, new electrical power and control, standby generator, bypass pumping, building upgrades, paving, grading and miscellaneous site improvements.
Specs
(click to expand/collapse)
Name | Size | ||
Crestwood PS Bid Specifications- May 2024 | 14.1 MB |