Alvarado Stairway Water Main Rehabilitation Project
Engineer's Estimate: $233,000.00 | The work to be performed under this contract shall consist of, in general, mobilization; providing traffic control; providing construction area signs; daily cleanup; testing; safety; trenchless water main rehabilitation using flexible fabric reinforced pipe (FFRP) and FFRP end connectors; final connections to the existing water main with new water main installed by open trench construction; fire hydrant lateral and assembly replacement; asphalt paving restoration; striping and marking restoration; utility adjustments; cleaning the site at the end of the job.
Addendum No. 1
(click to expand/collapse)
Name | Size | ||
921L Addendum No 1_2024-03-25 | 2.0 MB |
Addendum No. 2
(click to expand/collapse)
Name | Size | ||
921L Addendum No 2_2024-04-05 | 1.2 MB |