2021-22 Street Reconstruction Project
Engineers Estimate: $2.9 million | The work includes but is not limited to: Hot mix asphalt base repair and full depth reclamation, removing and replacing concrete sidewalk, curb and gutter, installing ADA compliant curb ramps, and replacing striping.