Pavement Rehabilitation Project and Park Pathway Restoration Project
The Work shall include striping removal, crack sealing, pavement grinding, localized asphalt concrete repair, asphalt overlays, slurry seal, pavement reconstruction, curb and gutter repair, curb ramp installment/replacement, installation of traffic striping and markings, installation of traffic signage, and utility adjustments.
Addendum No. 1
(click to expand/collapse)

Name | Size | ||
Addendum No. 1 - CIP703 and CIP702 | 246.2 KB |
Addendum No. 2
(click to expand/collapse)

Name | Size | ||
Addendum No. 2 - CIP703 and CIP702 | 776.3 KB |