23-24 and 24-25 Street Rehabilitation Project No. 60039 & 60048

Engineer's Estimate: $6,200,000.00 || The work includes, but is not limited to: mobilization, traffic control, water pollution control, dust prevention and control, site cleanup, asphalt concrete grinding/removal, asphalt concrete installation, asphalt concrete base repair, ADA ramp construction, utility cover lowering & restoring to grade, loop detector replacement, striping removal & replacement at various locations Citywide.

Status

Bidding Closed

Prebid Date8/30/24 2:00pm

Bid Date9/9/24 2:00pm

Company & Contacts

City of San Bruno
Jake Zhang  
(650) 616- 7065

Location

San Bruno, CA 94066