The work includes, but is not limited to: Rehabilitating approximately 3,257 feet of existing 14” steel main with new flexible fabric reinforced pipe liner, welding new steel pipe to existing for installation of liner connectors and pipeline appurtenances, conducting CCTV inspection and cleaning of existing main prior to installation of liner; excavation, shoring, and backfill of liner installation pits; installing one (1) combination air vacuum/release valve, providing auxiliary bypass pump and piping; site cleaning, restoration, and removal of debris, equipment, and excess material from the sites upon completion of work; and other work as shown on Drawings. All work items shall be constructed in accordance with the contract plans and specifications. Bidding Documents contain the full description of the Work.

Status

Accepting Bids

Prebid Date 1/30/25 10:00am
Bid Date 2/7/25 4:00pm