RO 572 Streetlight Conversion Project
Engineer's Estimate: $1,617,600.00 | The work includes but not limited to the removal of existing streetlights and streetlight foundations, replacement of pull boxes, installation of new streetlights with new poles, installation of conduit and conductors, replacement of concrete sidewalk, coordination of PGE and other related work as shown on plans and as specified in the specifications or as directed by the engineer.
Status
Accepting Bids
Bid Date | 1/14/25 2:00pm |
Location
Daly City, CA 94015