Nunes Treatment Plant Paving Project
Engineer’s estimate: $397,000 | Work includes, without limitation: 1. Paving of approximately 18,270 (SF) of roadway and pavement, as shown on the Contract Drawings. 2. Installation of approximately 275 LF of 4-inch Ductile Iron Pipe (DIP) by open trench, as shown on the Contract Drawings. 3. Installation of approximately 310 LF of four 1-inch conduits by open trench construction 4. Connection of the new water to the existing 6-inch fire hydrant lateral.
Status
Bidding Closed
Bid Date | 8/1/24 2:30pm |
Company & Contacts
Coastside County Water District
Jonathan Sutter
(650)292-9100
Location
Half Moon Bay, CA 94019