Nunes Treatment Plant Paving Project

Engineer’s estimate: $397,000 | Work includes, without limitation: 1. Paving of approximately 18,270 (SF) of roadway and pavement, as shown on the Contract Drawings. 2. Installation of approximately 275 LF of 4-inch Ductile Iron Pipe (DIP) by open trench, as shown on the Contract Drawings. 3. Installation of approximately 310 LF of four 1-inch conduits by open trench construction 4. Connection of the new water to the existing 6-inch fire hydrant lateral.

Status

Bidding Closed

Bid Date 8/1/24 2:30pm

Company & Contacts

Coastside County Water District
Jonathan Sutter  
(650)292-9100

Location

Half Moon Bay, CA 94019